KSEB Grid Intelligence & Telemetry AnalyticsLive Telemetry Synced
Kerala Power Outage Analytics & Reliability Report
Comprehensive data analytics on power outage frequency, peak load disruption hours, district uptime indices, and KSEB feeder maintenance telemetry.
487(16 Active OFF)
Total Outages Today6:00 PMPeak Outage Window
91.2%Kerala Grid Stability
KasaragodMost Reliable District
Filter Time Range:
District Scope:
24-Hour Outage Frequency vs Power Restoration Trend
Hourly pattern of reported trippings and successful KSEB feeder restorations.
Power OFF Restored
Primary Outage Drivers
Categorized root causes from KSEB telemetry logs (All Districts).
KSEB Scheduled Maintenance
25%Feeder Line Tripping (Rain/Wind)
20%Transformer Technical Fault
15%Unscheduled Peak Load Shift
40%Average Outage Duration by District (Kerala)
Mean resolution timeline per district measured in minutes of interruption.
KottayamHigh Risk3h 48m
ErnakulamHigh Risk3h 04m
ThrissurModerate Risk2h 32m
KozhikodeModerate Risk2h 15m
PalakkadModerate Risk2h 00m
MalappuramNormal Risk1h 38m
ThiruvananthapuramNormal Risk1h 25m
AlappuzhaNormal Risk1h 08m
KollamNormal Risk52m
PathanamthittaNormal Risk44m
IdukkiNormal Risk38m
WayanadNormal Risk32m
KannurNormal Risk28m
KasaragodNormal Risk22m
Top Affected KSEB Feeder Lines & Substation Sections
Substations experiencing highest tripping frequencies and line load shifts.
| # | Feeder Line / Substation | District | Total Cuts Today | Avg Resolution | Reliability Index |
|---|---|---|---|---|---|
| 1 | Kakkanad 110kV Substation Line 4 | Ernakulam | 48 | 45m | 92.1% |
| 2 | Kazhakoottam TechnoPark Feeder A | Thiruvananthapuram | 42 | 38m | 94.3% |
| 3 | Thrissur Town Feeder 1 | Thrissur | 36 | 52m | 91.8% |
| 4 | Mananchira Substation Line B | Kozhikode | 29 | 40m | 95.0% |
| 5 | Palakkad Industrial Substation | Palakkad | 26 | 62m | 89.4% |
| 6 | Pala Town Feeder 2 | Kottayam | 24 | 75m | 88.6% |
| 7 | Aluva North Feeder | Ernakulam | 21 | 32m | 96.2% |